Our Id : 4563792
: build 34km of chickadee line at 33kv insulation level from the rouxville substation to the bophelo proposed substation site to de-load the existing rouxville-zastron 22kv (rvz) rural line. construct 2.9km 22kv hare line from bophelo substation proposed site to zastron to deload rvz line of the zatron substation
Authority : eskom holding soc ltd
Tender No : FS111
Location : Refer Document
Due Date : 2025-02-04
Publish Date : 11 Dec 2024